The ADU Design Process: From First Sketch to Permit Set

Free Estimate on SiteA Written Price Before Work StartsVetted, Background-Checked ProsServing Kent and Nearby
The ADU Design Process: From First Sketch to Permit Set

Last updated November 25, 2026

The ADU Design Process: From First Sketch to Permit Set

A beautiful ADU floor plan that positions the unit 18 inches into the required rear setback isn’t a design. It’s a permit rejection that costs real time and real money to fix. Most ADU design failures in Kent aren’t aesthetic. They’re functional and regulatory, and they start with the same mistake: finalizing a floor plan before anyone measured the lot, located the utilities, or ran the property’s height and lot coverage math against the actual parcel. Design that treats code as a filter applied after the drawing is finished almost always sends the project backward. This guide walks through the sequence that keeps it moving forward, from the first site survey to the drawing set your city will accept.

Call (253) 499-8633

Quick Answer

The ADU design process runs in a fixed order: site survey and utility locate first, then a code check against your specific parcel, then schematic floor plans, then structural and energy compliance, and finally a permit-ready drawing set submitted to the city. Doing floor plan work before the survey and code check is what causes most redesigns. A good ADU design team gathers site constraints as design inputs, not as problems discovered after the plan is drawn.

Table of Contents

Why the Correct Sequence Matters More Than the First Sketch

There’s a sequence to ADU design, and it’s not the one most homeowners picture. People imagine a designer sketching a floor plan first, then handing it to someone to check against the rules. In practice, floor plan work done before the site data is in hand is guesswork, and guessing is exactly what turns a two-week design into a two-month redesign.

Here’s the sequence that works:

  1. A site survey that measures the actual lot boundaries and existing structures.
  2. A utility locate so you know where the water, sewer, gas, and power actually run.
  3. A code read of the specific parcel for setbacks, height, and lot coverage.
  4. Schematic floor plans drawn within those constraints.
  5. Structural and energy compliance work on the chosen scheme.
  6. Assembly of the final permit-ready drawing set.

Each step feeds the next. A survey that finds the garage sits closer to the property line than the records showed changes where an ADU can stand. A utility locate that finds the sewer line crossing the only practical building pad changes the whole placement question. When those facts are known before design begins, the floor plan is built on solid ground from the first line. When they’re discovered afterward, the drawing has to be reworked and resubmitted.

This is the part of the process that most determines whether your project stays on schedule and budget. It’s also the reason a dedicated ADU firm runs site work first, every time, no exceptions.

Our technicians have up to 15 years of experience. They’ve seen what happens when the order is reversed, and they know the difference it makes. At ADU Builder Kent, the surveying, the code check, and the plan work all happen within one team so nothing gets handed off between stages.

Step 1: Site Survey and Utility Locate Before Any Floor Plan Work

The site survey is the foundation document for everything else. It records where the property lines actually sit, where existing buildings and hardscape are located, where the grade falls, and how drainage moves across the lot. Nothing gets drawn until that’s confirmed, because the parcel is the only thing that doesn’t change during an ADU project.

Here’s what a proper survey covers:

  • Actual property line locations and distances to existing structures.
  • Grade and slope across the buildable area.
  • Locations of existing trees, fences, and hardscape that may constrain placement.
  • Where stormwater currently drains, so the new ADU can work with it rather than fight it.
  • Points of access from the street and how a unit can be reached without crossing the main house.

The utility locate happens alongside the survey. Water, sewer, gas, and electrical lines are underground, and where they cross the lot determines where an ADU can physically connect. A sewer main crossing the only open building area is a planning problem, and it’s much easier to solve before the floor plan exists than after.

Kent’s housing stock is a mix of older homes, larger lots, and infill parcels, and the survey is where those differences show up. A lot that looks generous on paper can turn out to be constrained once the setbacks and the utility lines are drawn in. Better to know that before you fall in love with a layout. Survey work is where design begins, and it’s the first step in any credible ADU builders workflow.

How Setbacks, Height, and Lot Coverage Shape Your Floor Plan Options

Code isn’t a filter you run at the end of design. It’s a set of inputs that shape what’s possible before a single wall is drawn. Setbacks, height limits, and lot coverage rules each cut into the buildable area, and together they tell you how big an ADU can be and where on the lot it can stand.

Here’s how each one works into the floor plan:

  • Setbacks define the zone where you cannot build. Where an existing garage, main house, or lot line sits closer than the minimum, the ADU has to move. Getting this wrong is the most common cause of a permit rejection, and it’s entirely avoidable when the survey is done first.
  • Height limits determine whether you can build a two-story ADU, whether a flat roofline or a pitched one keeps you inside the cap, and how a second floor volume can be inset to stay legal.
  • Lot coverage is the total share of the lot covered by buildings and other impervious surfaces. Existing homes, garages, and hardscape all count against it, so the ADU footprint has to fit within what’s left.

The exact setback distances, height figures, and coverage percentages depend on the specific property and the city’s current requirements. We confirm them with the city’s planning or building department before plans are final. What’s constant is the approach: run the math against your actual parcel before any floor plan gets drawn, so the plan is legal by construction, not by luck.

This is where a lot of well-intentioned designs fall apart. A designer works without confirming the parcel numbers, the plan looks great, and the city rejects the setback dimension. The fix is a redesign that pushes into the schedule. Treating code as a design input from the start is what keeps a garage conversion or a new build from bouncing back to the drawing board.

What a Permit-Ready ADU Drawing Set Must Include

A permit-ready drawing set is more than a floor plan. It’s a package of coordinated documents that together show the city your project is safe, code-compliant, and buildable. Missing any one piece sends the submittal back for another round.

Here’s what a complete set for an ADU in Kent looks like:

  1. Architectural plans. Floor plans, elevations, building sections, wall details, and door and window schedules, drawn to a consistent scale with all dimensions included.
  2. Structural engineering. Framing plans, foundation design, shear and lateral details, and the engineer’s stamped calculations for anything beyond prescriptive construction.
  3. Energy compliance. Documentation showing the design meets the Washington State Energy Code, including the building envelope, insulation, windows, and mechanical systems as required for your project type.
  4. Site plan with drainage notation. The survey brought forward into the design, showing property lines, existing structures, setbacks, the ADU footprint, and how stormwater is handled across the lot.

For prefab ADUs from manufacturers like Abodu, Cover, or Dvele, the package is different but no less detailed. The manufacturer supplies factory drawings and code documentation, and the permit set has to integrate those with local site conditions, foundation design, and utility connections. Getting that integration right is what makes a prefab submittal move through review without delays.

Assembling a complete set is exactly what our design and permit service is built to do. In our experience, the fastest way to a clean permit is to submit a complete package the first time rather than to submit early and correct later.

Design Decisions That Affect Long-Term Livability in Kent’s Climate

An ADU that looks good in a drawing can still be a hard place to live if it ignores the climate and the footprint. Kent sits in the Pacific Northwest, with a long stretch of cool, overcast, and damp months and a shorter bright season. That specific mix produces design decisions that matter more here than the aesthetics of the facade.

Start with light. In overcast conditions, natural daylight is scarce for much of the year, so window placement matters more than window count. Facing the largest glazing toward the brightest exposure, using higher windows to pull light deeper into a plan, and keeping interior walls low or open where possible all make a compact unit feel bright on a gray day. Clerestory windows and light wells are often worth the small structural cost.

Then storage. A small ADU lives better when storage is planned into the walls and floor plan from the start rather than added afterward. Built-in storage under stairs, along a hallway, and above the primary closets keeps the unit feeling open while giving residents a place for everything. In our experience, a compact ADU that feels spacious is almost always one with generous built-in storage.

Finally, exterior materials. The wet season is real here, and the exterior envelope has to shed water reliably year after year. That means properly detailed rain screens, correctly flashed windows and doors, and durable siding and trim chosen for a damp climate. A material that looks fine on a drawing but needs frequent recoating is a maintenance burden the owner will carry for the life of the unit. Every one of these choices traces back to the site conditions that the survey starts to establish, and they’re the details we weigh during the design phase of a junior ADU or a full-size build.

How Design-Build Differs From Architect-Then-Contractor

There are two ways to run an ADU project. The traditional sequence hires an architect to produce drawings, then hands those drawings to a contractor to price and build. Design-build runs design and construction under one team from the start. The difference shows up in what gets decided during design and how much the design changes once the bid comes in.

Under architect-then-contractor, the architect designs without pricing input. The plans are drawn to the owner’s vision, then go out to bid. When the bids come back over budget, the drawings have to change and the design is essentially redone. Material substitutions, simplified rooflines, and reworked window schedules all become change orders layered onto an already finished design.

Under design-build, the builder sits inside the design conversation from day one. Constructability feedback happens while the drawing is still being made. If a structural move is expensive, the design team knows before the walls are on the plan. If a prefab unit from Dvele or another manufacturer would beat a custom build on cost and timeline, that gets weighed during design rather than after the drawings are complete. The result is a plan that’s already budgeted and buildable by the time it reaches the city.

The gap between those two sequences is where ADU budgets usually break. A design that’s coordinated with the build from the beginning tends to hold its price. From design to permit to move-in, handled, is the standard we work toward, and it’s the reason full-cycle service stays under one team rather than getting split between firms.

Matching the ADU Format to the Property

The right ADU format isn’t a matter of taste. It’s a function of the lot, the existing structures, and what the homeowner wants the unit to do. Five distinct formats cover most properties, and the right recommendation is the one that fits the site, not the one the builder happens to prefer.

  • Ground-up new construction fits a lot with a clear buildable area outside the setbacks, and gives the most design freedom for size, layout, and finish level.
  • Garage conversions reuse an existing footprint, often fitting more ADU into the lot than a new build would allow. Your garage has more potential than you think.
  • Junior ADUs fit within the primary structure and can share the main home’s kitchen and living space, which makes them a practical choice for a family member.
  • Home additions that create an attached ADU can be the right fit on a lot where a detached unit won’t clear the setbacks.
  • Prefab ADUs from manufacturers including Abodu, Cover, and Dvele bring factory-built quality, a known design catalog, and a more predictable scope to the site.

The choice should come after the survey and the code check, not before. A lot that looks right for a detached unit can turn out to be a better fit for a garage conversion once the setbacks are measured. When design and construction are handled under one roof, the format recommendation is made by the team that will build it, so the design reflects the actual property.

Kent’s mix of lot sizes and housing styles means there’s no single best format. We look at the parcel first and let the property drive the recommendation.

What to Expect From the Design and Permit Timeline

The design and permit phases move through distinct stages, and each one has its own dependencies. The schedule that matters most is the one written into your estimate, because it’s the only one tied to your specific project and scope.

The general order looks like this:

  1. Site survey and utility locate. Establishes the physical facts of the parcel.
  2. Code review for the specific lot. Confirms setbacks, height, and lot coverage.
  3. Schematic design. Produces the initial floor plan and elevation options within those constraints.
  4. Design development. Refines the chosen scheme into a coordinated set of drawings.
  5. Structural and energy compliance. Adds the engineering and energy documentation the drawing set needs.
  6. Permit submittal and review. Submits the complete package to the city and works through any review responses.
  7. Permit issuance. Clears the project for construction.

Each stage can move faster with complete documentation and slower with missing pieces. That’s why the drawing set has to be assembled as a coordinated package rather than a stack of parts. The review time itself is set by the city, and we confirm that with the planning or building department rather than guessing. What we control is getting the package right the first time, which is the single biggest lever on how long the process takes.

Permits aren’t your problem, they’re ours. In-house permit navigation as a formal service means the submittal, the review responses, and the coordination with the city all go through one point of accountability.

Common Mistakes to Avoid

  • Drawing the floor plan before the site survey. A plan without confirmed property lines and setbacks is a guess. The fix is always to start with the survey, even when you’re eager to see a layout.
  • Skipping the utility locate. A sewer line crossing the only buildable area changes everything. Finding that after the design is done turns a smooth project into a redesign.
  • Treating setbacks as a final check. In Kent, setbacks, height limits, and lot coverage shape the buildable area before you draw a wall. Running the math at the end is what turns in into a rejection.
  • Submitting an incomplete drawing set. A missing structural calculation, energy compliance document, or drainage notation means another review cycle. A complete package is the fastest path to permit issuance.
  • Designing without pricing input. A design that hasn’t been priced during the design phase tends to come back over budget. Design-build coordination keeps the plan buildable and budgeted.
  • Ignoring the climate in envelope choices. Window placement for overcast light, built-in storage for a compact footprint, and durable exterior materials for a damp climate are not afterthoughts in Kent. They’re core design decisions.
  • Choosing the format before the site data is in. A detached unit, garage conversion, or attached addition should be chosen based on what the lot allows, not what sounded appealing first.

When to Call a Professional

Call a professional ADU team when the project is serious enough that a rejected permit or an over-budget redesign would be a real setback. That includes lots with tight setbacks, existing garages you want to convert, properties with unclear utility locations, and any project where you’re weighing custom construction against a prefab unit from a manufacturer like Abodu, Cover, or Dvele. It also includes the homeowner who has a rough sketch and needs to know whether the plan is actually buildable before spending on drawings. The site survey, the code check, and the permit package are exactly the work that most needs a specialist. ADU Builder Kent offers free estimates in Kent, and we walk through the process from site survey to permit set as a single coordinated service. Call (253) 499-8633. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.

Frequently Asked Questions

A project lead going over permit drawings with a homeowner

The Bottom Line

ADU design works when the sequence is right. Site survey and utility locate first, code check against the actual parcel second, floor plans third, and then structural, energy, and site documentation assembled into a complete permit set. A design team that treats code as a design input from the start keeps the plan buildable, legal, and on budget. Design-build coordination and in-house permit navigation eliminate the gaps that cause most ADU delays. If you’re ready to move from first sketch to permit set without the redesign in between, call (253) 499-8633 for a free estimate.

Written by the team at ADU Builder Kent.

Getting started with ADU Builder Kent in Kent

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Kent team

A local vetted partner works across Kent and the towns around it, and every job is priced in writing before work starts.

Areas we serve
A worker protecting the lawn before an ADU build starts

See how we work

How a project runs from the first call to the finished job, and what is written down before any work starts.

How we work
Need ADU help in Kent? Licensed & insured · free written estimates
Call (253) 499-8633
Local Service Coverage
ADU Builders KentADU Builders CovingtonADU Builders SeaTacADU Builders AuburnADU Builders Des MoinesADU Builders RentonADU Builders TukwilaADU Builders Normandy ParkADU Builders Federal WayADU Builders NewcastleADU Builders BurienADU Builders Black DiamondADU Builders Maple ValleyADU Builders FifeADU Builders MiltonADU Builders SumnerGarage Conversion KentGarage Conversion CovingtonGarage Conversion SeaTacGarage Conversion AuburnGarage Conversion Des MoinesGarage Conversion RentonGarage Conversion TukwilaGarage Conversion Normandy ParkGarage Conversion Federal WayGarage Conversion NewcastleGarage Conversion BurienGarage Conversion Black DiamondGarage Conversion Maple ValleyGarage Conversion FifeGarage Conversion MiltonGarage Conversion SumnerJunior ADU KentJunior ADU CovingtonJunior ADU SeaTacJunior ADU AuburnJunior ADU Des MoinesJunior ADU RentonJunior ADU TukwilaJunior ADU Normandy ParkJunior ADU Federal WayJunior ADU NewcastleJunior ADU BurienJunior ADU Black DiamondJunior ADU Maple ValleyJunior ADU FifeJunior ADU MiltonJunior ADU SumnerHome Additions KentHome Additions CovingtonHome Additions SeaTacHome Additions AuburnHome Additions Des MoinesHome Additions RentonHome Additions TukwilaHome Additions Normandy ParkHome Additions Federal WayHome Additions NewcastleHome Additions BurienHome Additions Black DiamondHome Additions Maple ValleyHome Additions FifeHome Additions MiltonHome Additions SumnerADU Design & Permits KentADU Design & Permits CovingtonADU Design & Permits SeaTacADU Design & Permits AuburnADU Design & Permits Des MoinesADU Design & Permits RentonADU Design & Permits TukwilaADU Design & Permits Normandy ParkADU Design & Permits Federal WayADU Design & Permits NewcastleADU Design & Permits BurienADU Design & Permits Black DiamondADU Design & Permits Maple ValleyADU Design & Permits FifeADU Design & Permits MiltonADU Design & Permits Sumner

Request a Free Estimate in Kent

Tell us what you need - ADU Builder Kent responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - We Answer 24/7